(EBRD) project in Canary Wharf
BPC were contracted to carry out the design, supply and installation of the ceiling works and the associated packages on the European Bank for Reconstruction and Development (EBRD) project in Canary Wharf.
The project consisted in the majority of the complete fit-out of 13 floors, between levels 12 and 24 with some additional works in the back of house areas in basement floors and the typical floor spaces on Levels 17 to 23 with open plan workspaces and meeting rooms.
The specialist floors were located on Levels 12 to 16 and 24 which contained most of the feature ceilings. These included the bespoke 3D baffle ceiling in the boardroom, as well as several types of bespoke timber and fabric ceilings.
These ceilings were developed to include the specialist lighting, whilst also being functional and enhancing the acoustics in the space.
The workspace floors consisted in the majority of SAS System 330 ceiling with different profiles and service troughs which were all custom made to accommodate the specialist lighting of varying sizes across the areas.
This project is on track to achieve an ‘’Outstanding’’ BREEAM accreditation for the fit out & ‘’Platinum’’ WELL Building Standard accreditation.